Project Realization Parameters Scope of supply

Cogen West Bratislava, Slovakia

2019

app. 30 MW

Feasibility study for cogeneration unit extension.

New nuclear unit, Czech Republic

2019

nuclear

Technical support – development of the technical part of the tender documentation.

Yunus Emre, Turkey

2019

2 x 145 MW, coal

Lender´s engineer for Firefighting and Conservation measures.

Can Odas, Turkey

2019

330 MW, coal

Owner’s engineer services for commissioning of the relocated coal-fired plant.

Trmice, heating plant, Czech Republic

2019

4 x 22,5 MW

Delivery of steam boilers and accessories within the construction of a gas boiler house and reduction station.

Trmice heating plant, Czech Republic

2019

4 x 22,5 MW

Commissioning of the gas boiler room.

Curtis, Spain

2018

40 MW, biomass

Project documentation (machine hall), construction and erection documentation (piping).

Talkha, Egypt

2018

2 x 210 MW, gas/oil

Overhaul of 2 feed water pumps.

Yunus Emre, Turkey

2017

2 x 210 MW, coal

Lender´s engineer – technical feasibility study.

CNPEC/CGN technical support, China

2017

nuclear

Support for HPR 1000 reactor certification.