Project Realization Parameters Scope of supply

Mochovce nuclear PP, Slovakia

2021 - ongoing

4 x 300 MVA, nuclear

Erection of generators including auxiliary systems.

Temelín nuclear PP, Czech Republic

2021 - ongoing

nuclear

Standardization of documentation.

UCED Energy s.r.o., Czech Republic

2021 - ongoing

130 MWe, steam-gas

Pre-project preparation for the construction of the steam-gas unit.

Dukovany nuclear PP, Czech Republic

2021 - ongoing

nuclear

Replacement of fire dampers.

Relocation of 400 MW CCPP, Czech Republic

2021

400 MW, steam-gas

Technical study for the relocation of a steam power plant from Spain to the Czech Republic.

Počerady PP, Czech Republic

2021

steam-gas

Pre-project preparation of the steam-gas unit.

ORLEN Unipetrol a.s., Czech Republic

2021

photovoltaics

Feasibility study - production of hydrogen from a photovoltaic power plant.

Ledvice PP, Czech Republic

2021

mine water treatment

Feasibility study – mine water treatment.

Yatagan, Turkey

2020 – 2021

3 x 220 MW

Owner´s engineer for rehabilitation of the PP.

Yeniköy Kemerköy, Turkey

2020 – 2021

2 x 210 MW, coal

Owner´s engineer for rehabilitation of the PP.