References

PLANT DELIVERY

PARAMETERS

SCOPE OF

Mtkvari, Georgia, 2015

2 x 21,5 MW, hydro

owner’s engineer for the construction of a hydropower plant

Can Odas, Turkey, 2015

300 MW, coal

owner’s engineer for a coal-fired plant relocation

Tkibuli, Georgia, 2014

150 MW, coal

feasibility study for new coal power plant

Gardabani, Georgia, 2012-2014

160 MW, coal

owner’s engineer for the construction of a thermal power plant
with connection to an existing service

Ledvice, CR, under construction

660 MW, coal

EPC delivery of a new unit with supercritical steam parameters

Prunéřov II, CR, under construction

3x 250 MW, coal

EPC delivery of comprehensive reconstruction of three power plant units

Počerady, CR, 2014

840 MW, gas

EPC delivery of combine cycle unit

Dukovany, CR, 2012

4x 440 MW, nuclear

increased performance and life time of operated blocks

Tušimice II, CR, 2012

4x 200 MW, coal

EPC delivery of overall reconstruction of four units of the power plant

New Talkha, Egypt, 2009

750 MW, gas

design and supply of technological, equipment including installation
and commissioning

El Kureimat II, Egypt, 2010

750 MW, gas

design and delivery of technological equipment, including installation
and commissioning

NPP J. Bohunice V2, SR, 2010

2x 505 MW, nuclear

design, assembly and supply of turbine generators to improve performance
and durability of operated units

Věžnice, CR 2009

2x 2 MW, wind

EPC supply life time

Nováky, SR, 2009

4x 110 MW, coal

dewatering gypsum, ash handling, steam extractions for heat supply

Mochovce, SR 2008

2x 440 MW, nuclear

replacement of generator coolers

Shen Tou, China 2005

2x 500 MW, coal

design and supply of technological equipment for the plant

Afsin Elbistan B, Turkey, 2005

4x 360 MW, coal

design, delivery of electrical and control systems for boilers

NPP Temelin, CR, 2003, 2002

2x 1 000 MW, nuclear

EPC supply of technology, including documentation,
installation and commissioning

Felton 2, Cuba, 2001

1 x 250 MW, oil

EPC supply of heavy fuel oil fired unit

Ayoun Moussa, Egypt, 2000

1 x 250 MW, oil

design, supply, installation and commissioning of the power unit

Mochovce, SR 2000, 1998

2x 440 MW, nuclear

EPC supply of technology, including documentation, installation, and commissioning

Nováky, SR, 1998 

2 x 110 MW, coal

EPC delivery of desulfurization plant

Talkha, Egypt, 1995 

2 x 210 MW gas/oil

EPC delivery of two gas heavy fuel oil fired units

Shen Tou, China 1993

2x 500 MW, coal

design and supply of technological, equipping of units

NPP Dukovany, CR, 1985-1987

4x 440 MW, nuclear

EPC supply of technology, including documentation, installation,
and commissioning

NPP J. Bohunice V2, SR,
1985, 1984

2x 440 MW, nuclear

EPC supply of technology, including documentation, installation,
and commissioning

Soma 1–6, Turkey, 1983–1992

6x 165 MW, coal

EPC supply

Melnik III, CR, 1980

500 MW, coal

EPC delivery of the technology, including installation and commissioning

NPP J. Bohunice V1, SR,
1980, 1979

2x 440 MW, nuclear

EPC supply of technology, including documentation, installation,
and commissioning

Nuevitas, Cuba, 1979, 1972, 1969

3x 64 MW, mazut

design, supply of technological equipment, supervision

Počerady I, II, CR, 1977, 1971, 1970

2x 200 MW, coal

EPC delivery of the technology, including installation and commissioning

Ennore, India, 1971, 1970

2x 60 MW, coal

design, supply of technological equipment, supervision

Ledvice, CR, 1967

200 MW, coal

EPC delivery of technological parts, including installation and commissioning

 

A part of a/m selected references was executed together with the sister company ŠKODA PRAHA Invest s.r.o.